Özkanoğlu journal

Prepare a window and door quotation brief

Organise approximate dimensions, quantities, finishes, glazing and scope into a clear window schedule. A step-by-step guide for home and export enquiries.

Prepare a window and door quotation brief

A useful preliminary quote starts with a clear schedule

Windows in different rooms may look similar but need different dimensions, opening types or glazing. Give each distinct opening a reference such as P01 or P02. Use a quantity for identical items; list a different size or opening arrangement separately.

1. Describe the project

State the city, building type, whether the work is new-build or refurbishment, and its current stage. Separate your requirements for fabrication, removal of existing frames, installation and shipping. A target date is a planning request; production and delivery lead times must be confirmed in the quotation.

2. Label approximate dimensions clearly

For an initial assessment, provide width and height in millimetres and explain exactly what you measured. A structural opening, finished opening and existing frame’s outside dimensions are different measurements. Do not add or deduct an assumed installation allowance; record what the measurement represents. Production dimensions require a survey and technical approval.

Example entry: P01 — living room — approximate opening 1800 × 1500 mm — 2 units — right-hand sash opens when viewed from inside — finish and glazing to be discussed. This illustrates a schedule entry, not a recommended production size for any system.

3. Describe the finish and glazing

“Grey” may not identify a finish precisely. Include a code, texture and internal/external finish preference if known. ADOPEN’s 888 page lists laminate colours, while ASAŞ’s RST162 page describes powder-coated and anodised finishes. Do not treat different surface treatments as equivalent because the colour names sound similar. Confirm a sample, compatibility and availability.

For glazing, describe your priorities as well as any known specification: thermal insulation, solar control, acoustic comfort or safety. Ask for technical advice rather than selecting an unfamiliar glazing build-up as a final requirement.

4. Connect the drawings to the schedule

Use the same P01/P02 references on the plan and product list. Show opening directions as viewed from inside. Include the drawing revision and date. The quotation tool lets you save different items, specify quantities and upload a project PDF. Follow the current file limit displayed by the upload field and remove personal information that is not needed for the enquiry.

5. Add delivery requirements for export

Provide the destination country, city, delivery point and required documentation. Clarify responsibility for packaging, transport, customs and installation during quotation. Do not assume that a particular national certificate or test class automatically applies to every system. Share the scope through the international enquiry route.

Check before sending

  • Are item references, quantities, units and opening directions consistent?
  • Are confirmed finishes and glazing distinguished from options still to be discussed?
  • Are removal, fabrication, installation and delivery requirements clear?
  • Are contact details, drawing revision and project location correct?

Technical sources

Sources checked on 18 November 2026. The manufacturer pages below support the finish examples. The schedule format is a practical suggestion for preparing an Özkanoğlu quotation enquiry.

Back to all articles